Special Projects
Governor’s
Island Harbor School
This unique project is located in the historical, 172-acre National Monument known as Governors Island and is the first project of a comprehensive plan for the redevelopment use of the island since the U.S. Army and Coast Guard regional administrative centers left in 1996.
Roosevelt Island – Octagon Park
DVL provided design engineering services for modifications to Octagon Park on Roosevelt Island. These modifications include site lighting and site plumbing and drainage associated with drinking fountains, new sports steel spray fixtures (misting stations) and ground hydrants. DVL also provided engineering design for modifications to the existing comfort station which included not only upgrades to plumbing systems but also electrical design for telephone, internet, security and card reader system infrastructure.
Jersey City Pump Station/Colgate Clock
To address the changing weather patterns that have been seen in recent years, DVL is provided design services to create a new pump station in Jersey City to ensure appropriate and efficient drainage during storm events. This pump station was designed to account for pressures noted in this densely populated and beautifully developed area of Jersey City, which also contained New Jersey tallest structure. In an effort to maintain the aesthetic appeal of this area, a park was also designed to disguise equipment complete with the presence of the Colgate Clock. DVL was also the electrical engineer for the restoration of the historic clock which faced the New York City Skyline for 90 years.
NYC Department of Parks and Recreation
DVL Consulting Engineers, Inc. is currently providing design engineering services for the NYC Department of Parks and Recreation for various sites throughout New York City. Below are three examples of projects DVL completed design for:
Ogden Plimpton Playground, Bronx, NY DVL Consulting Engineers, Inc. provided design engineering services to assist in upgrading this community playground.
Building Conversion Projects
Stella Maris School
The Stella Maris School involved the conversion of a catholic school to a public primary school. DVL provided mechanical, electrical, and plumbing design for this multi-phase project. This project will be completed in two phases to provide partial usage of the building and serve the needs of the community, as the entire building is renovated. This requires specific attention be given to MEP systems designed to modify the existing spaces but create a basis for the creation of a larger interconnected system as the two portions of the school become one. Design is currently underway for the second phase of this project and requires upsizing and upgrading incoming services and reconnecting systems between the two portions of the building.
Saint Mary Gate of Haven
The Saint Mary Gate of Heaven project involved the conversion of two buildings at this former Catholic school to a public primary school. DVL provided mechanical, electrical and plumbing design for this project which was to be modified in two phases. The first phase involved design for an annex building that existed on the school grounds. This annex was renovated as a standalone building, which made phasing the design of the entire school and subsequent construction and occupation of that portion of the school more readily achieved. Once the annex portion of the building was occupied for over two years, design began and is in progress for the remainder of the school.
Technical Construction Services Support
West Point
DVL is currently performing QAQC for the General Contractor of four projects at West Point while providing MEP and FP technical support for shop drawing review and meetings with US Army Corp of Engineers.
Special Projects
The 26 Broadway project consists of three different schools designed to occupy several leased spaces within a 32 story high rise office building located in the area near Wall Street in New York City. The first school designed was the Urban Assembly School of Business for Young Women, which occupies three floors of the building. The space was modified with new mechanical systems to provide for general heating, ventilation and air conditioning requirements and accommodate new facilities such as science laboratories and locker rooms. New energy efficient lighting fixtures were provided for the school as well as a variety of electrical systems, including a local access network, intercommunication and television distribution systems, video surveillance and fire alarm systems. Plumbing systems were modified or extended and new systems were also designed to accommodate the new student population. In a similar fashion two other schools were created within this existing facility, including one which was renovated from a museum.
Full gut rehabilitation of a six story high rise building formerly occupied by the New York State Court System. DVL Consulting Engineers, Inc. was the Design Engineer for HVAC, electrical, fire protection and plumbing systems for a $65,000,000 project. The HVAC system for this facility needed to be specialized to accommodate the very low slab to slab distances. The innovative HVAC design employed central rooftop HVAC units, and dual temperature, floor mounted, fan coil units within each space. Chilled water to fan coil units was obtained from a roofmounted, modular, air cooled chiller. This very special adaptation to the existing structure required that a new floor be added to house a new gymnasium with an interstitial space between the existing roof and the floor of the new gymnasium floor. The interstitial space accommodated mechanical equipment for the project. Intensive coordination and acoustical calculations were performed to ensure the HVAC system met the noise criteria in each space. All new incoming utilities and services were provided for this project.
The PS-347X is a standalone five story primary school with a total area of the building is 50,000 sq. ft. Key features include being located adjacent to an elevated track of the NYC Subway System and structural system being all concrete poured with prefabricated exterior wall assemblies. The HVAC design consisted of air cooled modular chillers for cooling and gas fired condensing type boilers for heating; air systems consisted of roof top variable air volume units for service of classrooms and constant air volume units for service of assembly spaces (cafeteria and exercise areas).
DVL Consulting Engineers, Inc. provided mechanical, electrical, plumbing and fire protection engineering services for the creation of this new charter school. This new five-story, 125,000 sq. ft. school was created as part of the Harlem Children’s Zone initiative to provide quality education for children in Harlem from Preschool to High School and to offer resources to the community. Promise Academy offers an extended school year and school day, additional academic assistance and extensive extracurricular activities. Harlem Children’s Zone is also open 24 hours a day to provide family assistance including Health Clinic to serve the community.
DVL Consulting Engineers, Inc. provided engineering services for the this brand new school building being incorporated into the Petrides School Campus in Staten Island, NY. DVL provided all mechanical, electrical, plumbing and fire protection design engineering for this new 51,000 sq. ft. school designed on the lot of the previous school’s annex building.
The Mayor of NYC’s Universal Pre-K Initiative led to the creation of several new school spaces intended to provide preschool education for all children throughout New York City. DVL provided MEP/FP engineering to modify existing spaces to create these new schools, many of which required significant modifications to leased floors in high rise buildings. These projects required significant coordination and strategic efforts to maintain progress to meet strict schedule requirements. The following Pre-Ks were created as part of this initiative: PS 695K, PS 77R, PS 66R, Kew Gardens PreK, Regina Pacis PreK
Simultaneous design and construction of one of the largest school campuses in the history of the NYC School Construction Authority. The project consists of three (3) schools: Two (2) intermediate schools (PS/IS 208 and PS/IS 266) and one (1) High School for the Teaching Professions. The project consists of approximately 450,000 square feet of educational space. DVL is providing full HVAC, electrical, plumbing and fire protection systems design and construction services for a design builder. The project also includes full site lighting design coordinated to compliment the aesthetics of the neighborhood and the site.